Rais Kola Project

RAEIS KOLA DIVERSION DAM & IRRIGATION CANALS
RAEIS KOLA IRRIGATION SCHEME

Project Purpose :

Construction of Raeis Kola Concrete diversion Dam
Construction of Right bank Earth Dike
Construction of Left bank Earth Dike
Construction of Concrete Cutoff wall
Construction of Concrete Drop for Stabilization of river bed
Construction of Gabion Drop for river bed Stabilization
Construction of river diversion canal
Construction of Raeis Kola Irrigation canal
Construction of Halidasht Irrigation canal
Construction of Hydraulic structures
Provide and Installation Hydro mechanical & Electrical Equipment

Contractual Specification :
Client :
MAZANDARAN Regional water authority

Consulting :
MAHAB GHODS Consulting Engineers Co.

Technical Specification :

  • Type of Main Dam                                                Concrete
  • Type of abutments                                               Earth Dike
  • Type of Spill way                                                   Chute Spill way
  • Height of Spill way from Foundation                 5.8m.
  • Length of Spillway                                                70 m.
  • Length of Cutoff wall                                            129 m.
  • Regulated discharge                                            3.74 C.m.s.
  • Length of Irrigation canals                                   13.69 Km.